Do you know what…?

Do you know how much electricity AI’s data centres could consume by 2030?

Monday 28 September 2026

A modern AI data centre connected to electricity, cooling and renewable-energy infrastructure.
Illustrative editorial image

Listen to today’s article

0:00 / 0:00

Artificial intelligence is often discussed as though it existed purely in the cloud, yet its rapid expansion is increasingly the physical limits of the energy system. The International Energy Agency estimates that electricity consumption by data centres could roughly double from 485 TWh in 2025 to about 950 TWh in 2030, close to 3% of global electricity demand. AI-focused facilities are expected to grow even faster, making grid capacity, transformers and reliable power supply potential . The paradox is striking: software may feel weightless, but the infrastructure behind it is decidedly power-hungry. As demand scales up, operators will have to contend with grid constraints while efficiency improvements try to keep consumption in check.

The wider picture is more nuanced than headlines about an impending energy crunch might suggest. The IEA expects data centres to account for less than 10% of global electricity-demand growth between 2024 and 2030, meaning industry, electrification, electric vehicles and air conditioning remain larger drivers overall. Nevertheless, data centres are unusually concentrated geographically, so their local impact can be far more pronounced than their global share implies. In my view, that distinction is the crux of the debate: the challenge is not simply how much electricity AI uses, but whether grids can deliver it in the right places, at the right time, without creating avoidable . In other words, .

Today’s expression

the devil is in the detail

Meaning: important complications often emerge in the specifics.

Example: The strategy looks convincing, but the devil is in the detail.

Check your understanding

18-question test

Answer all the questions, then check your results.

  1. True / False

    1.The IEA estimates that data-centre electricity consumption could roughly double between 2025 and 2030.
  2. 2.The reading says data centres will be the largest driver of global electricity-demand growth through 2030.
  3. 3.The geographical concentration of data centres can make their local impact greater than their global share suggests.
  4. Reading Comprehension

    4.What central paradox does the first paragraph identify?
  5. 5.Why is the wider energy picture described as more nuanced than alarming headlines suggest?
  6. 6.Inference: What can reasonably be inferred about planning future AI infrastructure?
  7. Grammar & Phrasal Verbs

    7.Complete the counterfactual comparison: AI is discussed as though it ___ purely in the cloud.
  8. 8.In this context, what does “scales up” mean?
  9. 9.Which sentence would sound most natural in professional English?
  10. 10.What relationship does “while” establish in this sentence?
  11. Prepositions

    11.Complete: AI expansion is colliding ___ the physical limits of the energy system.
  12. 12.Complete: 950 TWh would be close ___ 3% of global electricity demand.
  13. 13.Complete: Data centres could account ___ less than 10% of global electricity-demand growth.
  14. 14.Complete: Grids must deliver electricity ___ the right places and at the right time.
  15. Vocabulary & Synonyms

    15.“Power-hungry” is closest in meaning to:
  16. 16.“Bottlenecks” is closest in meaning to:
  17. 17.To “keep consumption in check” means to:
  18. 18.What does “the devil is in the detail” mean here?

0 / 18 answered